Every city on this list runs its own building department with its own permit process and its own inspectors. Redwood City does not handle a kitchen permit the same way San Mateo does.
Abraham has filed in these cities before. He knows what each one asks for and how long it takes, which is why our schedules hold.
There is a second reason. Peninsula houses are mostly post war ranches and mid century builds with knob and tube leftovers, galvanised supply lines and undersized panels. We have opened enough of these walls to price the surprise before it becomes a change order.